Risk Management
Know every risk.
Own every outcome.
A real-time risk register with AI-powered scoring, full lifecycle tracking, and direct links to your controls and evidence — all in one place. No spreadsheets. No manual cross-referencing.
What it does
Everything your risk lifecycle needs
Full lifecycle management
Every risk moves through six defined stages: Identified → Assessed → Mitigating → Monitoring → Resolved → Closed. Nothing falls through the cracks.
AI-powered scoring
Likelihood × impact matrix calculates your risk score automatically. Claude estimates the residual score after your mitigation plan is applied.
Risk-to-controls mapping
Link any controls from your library directly to a risk. AI-suggested controls appear as toggleable pills at creation time — select and save in seconds.
Owner assignment
Assign each risk to a team member with a target resolution date. Automated notifications fire when risks are assigned or when remediation deadlines approach.
Evidence attachment
Attach documents, screenshots, and exports directly to any risk. Every attachment is SHA-256 verified — your evidence is tamper-evident from day one.
AI Risk Insights Panel
One click opens a Claude-powered analysis: inherent risk score, estimated residual score post-mitigation, key vulnerabilities, and next recommended actions.
How it works
From description to closed — in one workflow
Describe
Log a risk in plain English or use the guided modal. The AI pre-fills the category, likelihood, impact, and mitigation plan. You review and adjust — nothing is locked.
Score & assign
The likelihood × impact engine calculates your risk score instantly. Assign an owner, set a target resolution date, and link the relevant controls from your library.
Track to close
Move the risk through each lifecycle stage as remediation progresses. Controls link back automatically. The AI watches for residual risk and flags when action is needed.
Works seamlessly with
The rest of your compliance workflow
Controls Library
Every risk links directly to your control library. Map ISO 27001, SOC 2, or NIST controls to any risk — and see cross-framework coverage instantly.
Learn moreEvidence Locker
Attach SHA-256-verified evidence directly to risks. Every document is tamper-evident and ready for auditors without any manual re-organisation.
Learn moreAI Advisor
The AI reads your full risk register to give contextual guidance — scoring recommendations, control suggestions, and gap analysis in plain English.
Learn moreReady to get
audit-ready?
Book a 30-minute demo and see how RiskGuard can get your startup compliant — without the consultant fees.